Marina / 2008
The Pearl, Qatar
April 6th 2008Rolec has won the order to supply services to the 1000 berth marina project on The Pearl, Qatar.
A total of 536 x Rolec Classic pedestals have been chosen for their ability to offer services ranging from 32amp to 250amp three phase along with water, TV, telephone and illumination. Superyachts will have up to 400amp three phase supplies provided by Rolec Megamaster units. Electricity and water services are monitored by the Rolec BerthMaster computer control system. Emergency services are provided in the form of 136 x multi-point fire hydrants.
A multi-point sanitation pump-out system will be installed using 44 x Rolec pump-out pedestals