
Search Results
413 results found with an empty search
- BasicCharge:EVs installed across URBN’s new distribution centre
CASE STUDY BasicCharge:EVs installed across URBN’s new distribution centre As part of their brand new distribution centre, URBN required EV charging points for their employees to recharge their electric vehicles whilst at work. SCOPE Design and manufacture a combination of 1way and 2way BasicCharge:EVs for URBN’s new development, allowing easy-to-use charging for employees and visitors. SOLUTION Supply and installation of BasicCharge:EVs across URBN’s new distribution centre, complete with LED amenity lighting, allowing employees to recharge their vehicles throughout the day, as well as night for night-time workers. PREVIOUS NEXT URBN
- Lock, Dock and 2-Way Charging; Rolec Carries Out Flood Repairs and EV Install for Leicestershire Marina
CASE STUDY Lock, Dock and 2-Way Charging; Rolec Carries Out Flood Repairs and EV Install for Leicestershire Marina PILLINGS LOCK MARINA Located in the heart of Leicestershire, Pillings Lock Marina has become a hub for explorers, offering the perfect balance of an idyllic countryside setting with quick and easy access to three nearby bustling cities. It encourages people to utilise Britain’s inland canal networks by providing a welcoming centre with on-site moorings and a waterside restaurant, fostering a sense of community among visitors. SCOPE Last year’s unprecedented flooding in the surrounding area caused significant damage to Pillings Lock Marina’s docking services, creating an urgent need for repairs or replacements. Having used Rolec for their previous services, the team at the marina reached out to us to facilitate the repairs and handle installation of new hardware. The team was looking for a cost-effective solution that would still provide users with the highest quality, weatherproof services, with upgrades to site accessibility and visibility. Furthermore, they wanted to include electric vehicle charging facilities for visitors, making the site more attractive to eco-conscious drivers while also providing a charging option for locals visiting the restaurant – all while maintaining a cohesive site aesthetic. SOLUTION Our Rolec installation team fitted Pillings Lock Marina with 29 x 4-way Classic Service pedestals to get their services back up and fully operational. All units included built-in LED lighting paired with an additional 8 lighting pedestals to help meet their need for accessibility by providing visibility along the dock for boats moored on-site, as well as IP44 rated sockets, made to meet many outdoor weather conditions. All service pedestals were fitted with SmartCard metering, giving the team at Pillings Lock Marina more flexibility in managing site electricity and water usage, while allowing visitors to manage their utilities independently and with full transparency. Additionally, Rolec supplied the site with 6 Classic SOS pedestals so that customers mooring had the security of knowing all emergency equipment is available to them if ever the need arises. Visitor EV charging was managed through the installation of a dual-socketed 7.4kW Rolec BasicCharge pedestal, to provide overnight charging to guests and visitors. Which is once again fitted with built-in LED lighting, for increased accessibility. BENEFIT Thanks to the hardware supplied by Rolec, the team at Pillings Lock Marina were able to reinstate the electrical and SOS services, getting them up and running for the marina’s much-anticipated reopening. With SmartCard metering, visitors now have more flexibility over electricity and water, while the site benefits from real-time usage and pricing reports. By adding pay-to-charge EV charging, they will generate passive revenue and attract more electric vehicle drivers looking to rest, recharge, and refuel – boosting visitor dwell time and overall business. PREVIOUS NEXT Pillings Lock Marina
- Product Support >
My unit was installed a long time ago, and is out of warranty, but has now developed a fault. Will I have to purchase a new unit? Home Site Structure Support Site Structure My unit was installed a long time ago, and is out of warranty, but has now developed a fault. Will I have to purchase a new unit? Product Support My unit was installed a long time ago, and is out of warranty, but has now developed a fault. Will I have to purchase a new unit? In most cases absolutely not! As our units are of a modular design, in the majority of cases a replacement component can be ordered and simply swapped out by your electrical contractor. Therefore, repairing your unit is usually easier, cheaper and greener! For further assistance please contact us via our online chat where one of our team can assist. Our live chat is available Monday to Friday 8:30am – 4:30pm GMT. Alternatively, use our contact form or drop us a call on +44 (0) 1205 724 754. 8 September 2023 Last updated: Related Support My unit was installed a long time ago, and is out of warranty, but has now developed a fault. Will I have to purchase a new unit? My smart charger has gone offline and I cannot connect to the unit? My charging cable is stuck? What size electrical supply do I need for my charger?
- Enquiry
Enquiry I am...* An Individual A Company Next
- Wattif Provides Funded Rolec EV Chargepoint Solutions to Mullingar Golf Club
CASE STUDY Wattif Provides Funded Rolec EV Chargepoint Solutions to Mullingar Golf Club MULLINGAR GOLF CLUB Mullingar Golf Club is located at Belvedere, Ireland, 5km south of the town centre and just off the main N52 (Nenagh – Dundalk) route, 80km west of Dublin along the M4/N4. The course layout is the work of famous Scottish golf course designer and 5 times Open Champion James Braid (1870 – 1950). Although some changes have been made since its creation in 1935, Mullingar is essentially as its designer intended, a championship challenge set in a mature wooded parkland that was once part of the Belvedere Estate. The course runs to 6,685 yards with a classic par 72 balance of 10 par 4s, 4 par 5s and 4 par 3s. Its routing is player friendly, returning to the club house at 3, and 9. All four par 3s are feature holes, but the 209 yard second is the signature hole, with its elevated tee and green it is considered one of the best par 3s in Irish golf. SCOPE The Golf Club is situated lakeside in Mullingar, Westmeath and offers golfers and visitors a World Class golf venue. With the increase in electric vehicles adoption, and members and visitors wanting EV charging whilst playing golf or using the Club’s facilities, the Club looked to install EV chargers to meet the growing request and demand for EV charging. With a car park capable of accommodating 150+ vehicles, The Club reached out to Wattif EV to provide initial charging of 4 car park bays with a build out programme to match EV charging demand over a multi-year period. The current site’s electrical capacity required a solution that offered charging load management, and local lighting at the charger location was of high importance to the client for a safe charging experience. SOLUTION A joint venture for a multi-year managed services EV charging infrastructure comprising design, installation, commissioning, service and maintenance was agreed, with 24/7 user helpline and load management services. Wattif EV would manage the tariff and pricing, as well as user registration, for both mobile App and RFID transactions. Wattif EV would manage the life cycle of the assets from design to future build out. The Rolec EV Quantum 22kW dual pedestals were selected for quality, performance, and aesthetics. The installation with civils took two weeks from initial site access to commissioning and staff/public charging, with civil and electrical installation performed by Ascent Energy Services. The installation took place whilst the Club remained open to members and guests, with civils and electrical connections being made whilst the Club operated, and with barriers/access managed around the operating Club’s needs. BENEFIT Wattif EV provided the Club with access to 4 Rolec EV charging sockets, and a services programme to operate, manage and maintain these chargers with a further roll-out programme to meet the increasing demand of EV charging. The back-end solution provides load management as well as demand reporting and operation features including tariff and user management, and the 24/7 support for users – allowing Mullingar Golf Club to concentrate and do what they do best – providing a World Class golfing experience and to all their members and visitors. PREVIOUS NEXT Mullingar Golf Club
- EV chargers for Hull Shopping Centre
EV chargers for Hull Shopping Centre EV Charging
- 16 x pump-out pedestals in quick succession
16 x pump-out pedestals in quick succession Marina Services
- WallPod EV Charging Stations for Smart Car
WallPod EV Charging Stations for Smart Car EV Charging
- MAINS & DISTRIBUTION UNITS | Rolec Caravan Hook-Ups
Ideal electrical distribution solutions for your caravan site, holiday and residential park. Over 35 years of experience in the caravan industry, allowing us to meet your individual requirements. MAINS & DISTRIBUTION UNITS Rolec provides the ideal electrical distribution solutions for all caravan and holiday park sites, with over 35 years of experience in industry, Rolec are the go-to manufacturer for electrical mains panels and distribution units. Meeting each individual requirement and electrical systems of any location, Rolec’s team of dedicated experts can provide a bespoke service to benefit each destination’s electrical distribution needs. The panels and units come complete with built-in switchgear, cable terminals and, where required, metering and street light operating photocells. Home Site Structure Caravan Hook-Ups Site Structure Caravan Hook-Up Product Ranges Site Structure Mains & Distribution Units KEY FEATURES MULTIPLE SWITCHGEAR ARRANGEMENTS IP44 - IP66 WEATHER PROOF BESPOKE MANUFACTURING STRONG & DURABLE UV STABILISED CE CERTIFIED The MAINS & DISTRIBUTION Unit Range Localised distribution of electrical circuits including circuit protection Provides isolation, current protection and fault current protection All electrical panels manufactured to suit each sites individual requirements and electrical design GRP, stainless steel or technopolymer enclosures Switchgear variants: 6amps to 2000amps (1Ø or 3Ø options) Able to accommodate all switching and monitoring management solutions Designed and built to suit all incoming and ongoing cable types and sizes IPX5 Rated Wall or ground (root) mountable Galvanised steel mounting frames Form II panels available ABS cable entry covering shroud SUITABLE FOR ROAD SIDES AMENITY AREAS STATIC CARAVANS COMMUNAL AREAS SPECIFICATIONS MATERIALS GRP, Stainless Steel or Technopolymer Enclosures DIMENSIONS Technopolymer (W x H x D): RE512 – 230mm x 316mm x 135mm GRP (W x H x D): RE514 – 515mm x 650mm x 250mm RE515 – 585mm x 800mm x 300mm RE516 – 800mm x 1060mm x 350mm Stainless Steel (W x H x D): S005E – 500mm x 700mm x 250mm S006E – 600mm x 800mm x 250mm S007E – 800mm x 1000mm x 300mm VOLTAGE 230v or 400v (1Ø or 3Ø) FAULT CURRENT RCBO/RCD OVERCURRENT PROTECTION MCCB/MCB or Fuses | Surge Protection DATASHEET Distribution Units - Data Sheet Need help with your caravan park, campsite or holiday park destinations? Give us a call on +44 (0) 1205 724 754 ENQUIRE NOW DATASHEET Button Need help with your caravan park, campsite or holiday park destinations? Give us a call on +44 (0) 1205 724 754 ENQUIRE NOW Ideal mains and distribution equipment for your caravan sites/park destinations OPTIONAL EXTRAS Fault current protection Form 2 panels Volt & amp meters Phase indicators CARAVAN HOOK-UPS RELATED PRODUCT RANGES Classic Touring Pedestals LEARN MORE Quantum Touring Pedestals LEARN MORE Direct Connection Units LEARN MORE PRODUCT CODES ENQUIRE NOW
- Rolec Wins Marina Project in Guadeloupe
Rolec Wins Marina Project in Guadeloupe Marina Services




